Projects

Leeds Train Station


Client: Integrated Utility Services (Northern Power Grid)
Location: Leeds
  • HV cable installation from new switch room to existing HV substations
  • 1500M of 11kv XLPE / SWA cable cleated on new containment above and below platform levels
  • Works completed autumn 2017

Leeds Train Station

Floodlight Cable Installation

Floodlight Cable Installation


Client: Mainlight
Location: Old Trafford, Greater Manchester
  • Cable installation to supply new floodlights
  • 2,000M of SWA cable
  • Installed to comply with UEFA legislation
  • Installed to upgrade lighting levels to facilitate Ultra High Definition 4K transmissions from stadium

High Voltage Supply Upgrade


Client: Virgin Media
Location: Small Heath, Birmingham
  • Excavation, duct installation and reinstatement
  • 11kV and control cable installation
  • Prepare ground for HV switch compound
  • Construct concrete bases
  • Erect palisade fencing

High Voltage Supply Upgrade

Nissan

Nissan


Client: Integrated Utility Services (Northern Power Grid)
Location: Sunderland
  • Power supply to new paint shop
  • 4000M of 11kv XLPE/SWA and control cable
  • Work carried our during 2017

New Bio Plant

Client: BASF
Location: Cleckheaton, Bradford
  • Installation of instrumentation and control cables
  • LV cable installation
  • HV cable installation

Marne Barracks

Client: Marne Barracks
Location: Catterick
  • Installation of new power supplies to accommodation blocks on camp.

BASF

Client: BASF
Location: Bradford
  • Installation of 50,000M of power and control cable for new LDP plant.

Sports Direct

Client: Sports Direct
Location: Distribution depot, Shirebrook.
  • New power supplies for automation / sorting in distribution warehouse.

Triumph Motorcycles

Client: SPEC
Location: Hinckley
  • New substation installation
  • 11kv cable diversion/installation
  • Summer 2017

Goliath Press Installation

Client: Firth Rixson
Location: Sheffield
  • LV cable installation
  • HV cable installation