Latest Projects
AG Barr, Milton Keynes
Preparing our own ducting for a forthcoming cable installation project. To provide power for a new chiller, this was a full excavation with 3 ducts added re-sanded, reinstated and re-concreted, all in spec to cope with the heavy traffic.
Integrated Utility Services
Thank you for taking the time to put this into words. “Your can-do attitude and the hard work from everyone was first-class. These things I mention are the textbook high standards everyone hopes for, but rarely receives, so thanks to everyone for achieving this”.
Upgrade at Severn Trent Water, Melton Mowbray
Our work with Severn Trent’s upgrade at Melton Mowbray is now complete. Working for Southern and Redfern Industrial Solutions, the six-week project saw the successful installation of 20,000m of power, control and instrument cable installed for multiple mixers, valves, pumps and monitors on three new huge aeration lanes.
Working at the Renishaw Factory, Miskin, South Wales
The site is undergoing a £50m 400,000 sq ft expansion. Our project with Renishaw involved the installation of almost 10,000m of power cable for the supply of new solar panels, busbars, distribution boards, car chargers and street lighting.
Working for AESSEAL on its “Factory of the Future” in Rotherham
A recent project for an award-winning company. Work involved 25 x 120mm 4cores plus other size LV’s,supplying multiple busbars and distribution boards at the site. The site will include £5.8M of ‘green-only’ investment, inc solar panels, battery storage, and other energy-saving measures.
Sonoco Recycling, Halifax
Sonoco Recycling offers a broad range of waste management services throughout Europe. This project involved HV Cable installation to feed the main supply to a new recycling press and various HV 11KV cables at various lengths in trench and duct, from the main distribution board to a new machine.
Ford’s transmission facility at Halewood, Merseyside
Ford have invested £230 million in transforming this site which safeguards the Ford jobs at Halewood. We installed almost 4.5km of 1c 400mm 33kv and control cable for a new substation. It will be Ford’s first electric vehicle component in-house assembly site in Europe with production beginning in 2024.
Card Factory in Wakefield – EV Charging Stations
Excavation, ducting, reinstating and LV Cable installation works. Seventy metres of trench ducted and then reinstated. Pulled in 35m of 4c 35mm XLPE cable and diverted another cable to feed the car charging stations.
Amazon Deeside – LV Cable Installation
LV cable installation for a new extension at Amazon’s 9,000 square metre ‘last mile’ delivery station on The Airfields site in Sealand, on Deeside.
Pod Point
Installation of power supplies at various sites for commercial electric vehicle charging units.
Morrisons Supermarket Company
Installation of submain cables at sites throughout the UK for Solar Panels.
Northern Power Grid (Integrated Utility Services)
Wren Kitchens Project Green, Barton on Humber Installation of 4500M of HV cable in dusts. Freeman hospital Newcastle, Installation of 3000M of HV cable for new Elective Treatment Centre.
Sports Direct
Shirebrook Distribution Centre, LV cable installation on containment for automation of picking.