Cable Installation and Cable Pulling

Low / Medium / High voltage and Fibre cable installation


Meticulous planning combined with years of experience and well-trained personnel ensures that our cable installations are carried out safely, diligently and on time. We utilise all the latest plant and cable installation equipment, including cable winches, cable drum jacks, rollers and drum trailers, all of which are carefully maintained and inspected at regular intervals to comply with current legislation.

Whatever our clients require, from straightforward labour, through diverse supply, to installation and commissioning, we work proficiently, safely, on time and within budget.

Low & High Voltage Power Cabling


Control Cabling
 


Instrumentation Cabling


Fibre Optic Cabling
 


CCTV Cabling
 


Data Communication Cabling


Electrical Duct Laying
 


EV charging points for commercial locations


Our Low Voltage (LV) and High Voltage (HV) cable installation service operates nationwide, 24 hours a day, 7 days a week, carrying out cable installation projects from 1kV to 132kV, ranging from small commercial projects to larger infrastructure schemes for the utilities such as the National Grid and Integrated Utility Services (Northern Power Grid).

“Power Contractors staff are really well trained and their attention to detail is superb. All our projects have been handled without any problems and they have done both the civils and cable installation in most cases, which always completed the job quicker than we expected”

Latest Projects

AG Barr, Milton Keynes

Preparing our own ducting for a forthcoming cable installation project. To provide power for a new chiller, this was a full excavation with 3 ducts added re-sanded, reinstated and re-concreted, all in spec to cope with the heavy traffic.

Integrated Utility Services

Thank you for taking the time to put this into words. “Your can-do attitude and the hard work from everyone was first-class. These things I mention are the textbook high standards everyone hopes for, but rarely receives, so thanks to everyone for achieving this”.

Upgrade at Severn Trent Water, Melton Mowbray

Our work with Severn Trent’s upgrade at Melton Mowbray is now complete. Working for Southern and Redfern Industrial Solutions, the six-week project saw the successful installation of 20,000m of power, control and instrument cable installed for multiple mixers, valves, pumps and monitors on three new huge aeration lanes.