Civil Engineering Works

Single source solutions, managed to
our exacting standards


Power Contractors offer in depth experience of civil engineering works and operate to superlative safety standards, bringing high standards of planning, safety and customer service to every site.

We offer our clients a single source solution, managed on site to our exacting standards, undertaking construction and civil engineering works including excavation, reinstatement and associated civil engineering works in any surface – grass, paving, flags, tarmac and concrete.

Civil Engineering Services Include:

Excavation and reinstatement of trenches for HV and LV cables


Construction of concrete bases for electrical switchgear and transformers


Duct and inspection chamber installation / construction


Erection of palisade fencing


Erection of lighting columns and signs


Core drilling
 


Electric Vehicle charging units


We have recently completed the following projects:

Explore manufacturing (Lang O’rourke), Worksop – Civil engineering works including HV transformer compound including transformer base, bund walls and palisade fencing.

Moulded Fibre Products, Scunthorpe – Civil engineering works including modification of existing HV substation including concrete base for HV Ring Main Unit, excavation of trenches and installation of HV cables.

Acorn Web, Normanton – Civil engineering works including construction of brick-built transformer compound, excavation of trenches for both HV and LV cables, core drilling.

“Using Power Contractors for end to end contacts enables better costings and integration between routes and installation”

Latest Projects

AG Barr, Milton Keynes

Preparing our own ducting for a forthcoming cable installation project. To provide power for a new chiller, this was a full excavation with 3 ducts added re-sanded, reinstated and re-concreted, all in spec to cope with the heavy traffic.

Integrated Utility Services

Thank you for taking the time to put this into words. “Your can-do attitude and the hard work from everyone was first-class. These things I mention are the textbook high standards everyone hopes for, but rarely receives, so thanks to everyone for achieving this”.

Upgrade at Severn Trent Water, Melton Mowbray

Our work with Severn Trent’s upgrade at Melton Mowbray is now complete. Working for Southern and Redfern Industrial Solutions, the six-week project saw the successful installation of 20,000m of power, control and instrument cable installed for multiple mixers, valves, pumps and monitors on three new huge aeration lanes.