• Cable Installation
    and Civil Engineering
    Works by Professionals

    Well trained personnel and meticulously managed projects. Careful planning ensures no delays, so that projects run on time, to plan and to budget.
  • Genuine concern
    for safety

    Our safety record, reliability, punctuality and expertise mark us out as true professionals.
    Ensuring the smooth running of contracts is our mission

15 Years of Excellence

20 Years of Professionalism and Experience


We Are Celebrating 20 Years of Safety and Professionalism
in Cable Pulling, Cable Installation and Civil Engineering Works.

Cable Installation


Low / Medium / High voltage and Fibre cable installation

Power Contractors have a reputation for professionalism and experience. We provide seamless cable installation and cable pulling services, across a wide range of sectors including utilities, renewables, petrochemicals ,building services and EV charging.

We offer full national coverage, consistently high standards and exemplary on-site conduct, combined with meticulous planning and safety compliance.

Utilities


  • National Grid
  • Distribution Network Operators
  • Water Utilities
  • Telecommunications

Renewables


  • Wind farms
  • Solar power generation sites

Petrochemicals


  • Heavy industry
  • Chemical engineering
  • Refineries

Building Services


  • Electrical Contractors
  • Industrial, food process and commercial sites

Electric Vehicle Charging


  • Industrial EVC units

Sport and Leisure


  • Stadiums
  • Leisure Parks
  • Hotels

Our Low Voltage (LV) and High Voltage (HV) cable installation service operates nationwide, 24 hours a day, 7 days a week, carrying out cable installation projects from 1kV to 132kV, ranging from small commercial projects to larger infrastructure schemes for the utilities such as the National Grid and Integrated Utility Services (Northern Power Grid).

“The days of inexperienced cable gangs are a thing of the past, on today’s sites you need contractors that have the ability to work within health and safety requirements as well as having the correct certification for access. Power Contractors have always delivered on all counts”

Civil Engineering Works


Single source solutions, managed to
our exacting standards

Power Contractors offer in depth experience of civil engineering works and operate to superlative safety standards, bringing high standards of planning, safety and customer service to every site.

Excavation of trenches


Duct laying


Reinstatement works on private land


Electric Vehicle charging units


Palisade fencing for outdoor substations


Street lighting erection


Concrete bases and structures for transformers and switchgear


Full National Coverage
and Consistently High
Standards of Service


Our safety record, reliability, punctuality,
and expertise mark us out as
true professionals.

Offering full national coverage, consistently high standards and exemplary on site conduct, combined with meticulous planning and safety compliance, Power Contractors have a reputation for professionalism and experience, providing a seamless service across a wide range of sectors.
“We have used Power Contractors for a number of recent cable installation projects. I can honestly say they have always given us a superb service, often to demanding timescales.”

Map

Cable
Installation

Civil
Engineering

Latest Projects

AG Barr, Milton Keynes

Preparing our own ducting for a forthcoming cable installation project. To provide power for a new chiller, this was a full excavation with 3 ducts added re-sanded, reinstated and re-concreted, all in spec to cope with the heavy traffic.

Integrated Utility Services

Thank you for taking the time to put this into words. “Your can-do attitude and the hard work from everyone was first-class. These things I mention are the textbook high standards everyone hopes for, but rarely receives, so thanks to everyone for achieving this”.

Upgrade at Severn Trent Water, Melton Mowbray

Our work with Severn Trent’s upgrade at Melton Mowbray is now complete. Working for Southern and Redfern Industrial Solutions, the six-week project saw the successful installation of 20,000m of power, control and instrument cable installed for multiple mixers, valves, pumps and monitors on three new huge aeration lanes.

Arla

BT

Sainsburys

United Utilities

Cedar Court Hotels

Lafarge

Tesco

easyJet

BAE Systems

Land Rover

Underground

David Brown

IBSTOCK

B&Q

National Grid

Yorkshire Water

NHS

University of Huddersfield

Shell