Cable Installation and Cable Pulling

Low / Medium / High voltage and Fibre cable installation


Meticulous planning combined with years of experience and well-trained personnel ensures that our cable installations are carried out safely, diligently and on time. We utilise all the latest plant and cable installation equipment, including cable winches, cable drum jacks, rollers and drum trailers, all of which are carefully maintained and inspected at regular intervals to comply with current legislation.

Whatever our clients require, from straightforward labour, through diverse supply, to installation and commissioning, we work proficiently, safely, on time and within budget.

Low & High Voltage Power Cabling


Control Cabling
 


Instrumentation Cabling


Fibre Optic Cabling
 


CCTV Cabling
 


Data Communication Cabling


Electrical Duct Laying
 


EV charging points for commercial locations


Our Low Voltage (LV) and High Voltage (HV) cable installation service operates nationwide, 24 hours a day, 7 days a week, carrying out cable installation projects from 1kV to 132kV, ranging from small commercial projects to larger infrastructure schemes for the utilities such as the National Grid and Integrated Utility Services (Northern Power Grid).

“Power Contractors staff are really well trained and their attention to detail is superb. All our projects have been handled without any problems and they have done both the civils and cable installation in most cases, which always completed the job quicker than we expected”

Latest Projects

Redruth School, Cornwall

Working for RG Kellow Ltd at Redruth School, we pulled in a new supply (x2 5c 70mm XLPE SWA at 175 meters in length) through outside ducting, inside through the sports hall and corridors. The work received an excellent report “The team you arranged to come to site were amazing! Highly professional and friendly.”

NWL Bran Sands, Middlesbrough

The Bran Sands Advanced Anaerobic Digestion Facility is operated by Northumbrian Water (NWL). The recent IUS 11kV upgrade project installation works at the NWL Bran Sands site were undertaken by Cube Ltd and the Power Contractors team. The client and the IUS Project team praised our professionalism and high installation quality.

Wentworth Woodhouse, Rotherham

As part of the wider heritage project, work began in April on refurbishing the stable block at Wentworth Woodhouse, which housed 100 horses back in the day. Our part in restoring this Yorkshire landmark involved installing several 4c 240mm SWA, from the external switch room, to various remote distribution boards.